Bani Kennah water systems had to undergo refurbishment. To enable the refurbishment work, the feasibility study prepared by another entity had to be reviewed, along with the other relevant documents available, including financial and economic reports. Based on this, AJi  identified needs and recommended improvements to the proposed restructuring and rehabilitation of the water systems. Modification and update of the hydraulic models for the 600-kilometre water and 350-kilometre wastewater systems were also done as required. 