July 06, 2025

AJi Awarded Key Water Infrastructure Project - North East Balqa WWTP

AJi, in joint venture with Egis Group, has been awarded the contract to deliver design review services and construction supervision for the Northeast Balqa Wastewater Treatment Plant. This nationally strategic project supports Jordan’s long-term water security and environmental resilience.

AJi is proud to serve as the Lead Consultant on this transformative assignment, which is being implemented in collaboration with the Ministry of Water and Irrigation and funded by the Agence Française de Développement (AFD) and the European Union.

With a total value of €60 million, the project reflects the strength of international cooperation and our shared commitment to delivering engineering solutions with long-term impact.

We remain dedicated to:

   • Strengthening infrastructure

   • Elevating water sector sustainability

   • Advancing Jordan’s 2023–2040 strategic vision