Tafilah Wastewater Plant
- Client
USAID/Water Authority of Jordan
- Location
Jordan
- Project Sector
Major Developments
Supervision Services for Tafileh Wastewater Treatment Plant
Contractor’s construction schedules, quality control and assurance plans, as-built drawings, operation and maintenance manuals, activity monitoring and evaluation plan, initial environmental expansion
This project included the demolition and replacement of the existing WWTP with a new facility, with a capacity of 10,000 cubic metres per day. The components included:
Site access road
Oxidation ditches, activated sludge process and secondary clarification
WAS/RAS conveyance systems
Disinfection, sludge thickening, dewatering centrifuges, drying beds and odour control
Administration, maintenance, dewatering, sludge pumping and chlorination
Instrumentation and control systems